BDS Certification

Conformity assessment according to national requirements

 

"STROYCONTROL 2003" Ltd. is authorized by the Ministry of Regional Development and Public Works (MRDPW) to assess the conformity of construction products with national requirements, holding Authorization No. ROSSP 06 since September 15, 2016.

  • Concrete – according to Order No. RD-02-14-1329/03.12.2015 of the Minister of Regional Development and Public Works, Annex No. 2, item 1

  • External Thermal Insulation Composite Systems (ETICS) – according to Order No. RD-02-14-1329/03.12.2015 of the Minister of Regional Development and Public Works, Annex No. 2, items 13 and 14

  • Unbound mixtures – according to Order No. RD-02-14-1329/03.12.2015 of the Minister of Regional Development and Public Works, Annex No. 2, item 9

  • Hydraulically bound mixtures – according to Order No. RD-02-14-1329/03.12.2015 of the Minister of Regional Development and Public Works, amended and supplemented by Order No. RD-02-14-590/05.07.2017, Annex No. 3, items 10.1, 10.2, 10.3, 10.4, 10.5, 10.6

  • Steel products for the reinforcement of reinforced concrete structures – according to Order No. RD-02-14-1329/03.12.2015 of the Minister of Regional Development and Public Works, amended and supplemented by Order No. RD-02-14-590/05.07.2017, Annex No. 3, items 1.1, 1.3, 1.4, 1.5

The specific national requirements and procedures are publicly available on the website of the Product Contact Point of the MRDPW: cpcp.mrrb.government.bg

Developed by the Association of Construction Product Conformity Assessment Bodies (ALOSSP) and approved by the MRDPW, the assessment procedure consists of the following steps:

Stage 1
Application Submission and Contracting

Acceptance and registration of the application, review of documents, and contract signing.

Stage 2
Product type identification

Option 2.1 Full Verification: Sampling and testing/calculation.

Option 2.2 Documentary Assessment: Recognition of test results from another accredited laboratory.

 

Stage 3
Factory Production Control (FPC) audit

Option 3.1 Full Inspection: Initial on-site inspection (audit) at the production facility.

Option 3.2 Documentary Assessment: Review of documents based on a valid Quality Management System certificate.

Stage 4
Issue a certificate of compliance

Preparation of the report and decision on certification.

 
Stage 5
Annual Surveillance

Option 5.1 Full Inspection: Periodic on-site inspection of the factory production control.

Option 5.2 Documentary Assessment: Review of documents and records based on a valid management system certificate. 

 
Stage 6
Surveillance testing of samples

This is carried out only for products where specified in the applicable product standard.

Stage 7
Decision on the validity of the certificate.

Preparation of a report with a recommendation on the certificate's validity.

 
 

Tab Content

This is a basic text element.

Building Trust. Certifying Quality.

STROYCONTROL
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.